CPRI Approved Panel Board Manufacturer


Projects

Details Of Project Executed And Under Execution In Last 3 Years

SI.No Year Client Name Nature of Job Value in Rs. PO/WO No. Poject Status Contact Person Contact No.
1 2017 Shalimaar Mall Pvt Ltd - 11th Floor Shalimar Titanium, Shalimar Corporate Park Vibhuti Khand, Gomti Nagar, Lucknow Electrification Work with Panels 1,93,84,000.00 Completed Ajay Singh 9918428877
2 2017 Shalimaar LakeCity Pvt Ltd (ANS Developers Pvt Ltd) 11th Floor Shalimar Titanium, Shalimar Corporate Park Vibhuti Khand, Gomti Nagar, Lucknow Electrification Work with Panels 1,88,68,852.00 Running Ajay Singh 9918428877
3 2017 Shalimaar LakeCity Pvt Ltd (ANS Developers Pvt Ltd) 11th Floor Shalimar Titanium, Shalimar Corporate Park Vibhuti Khand, Gomti Nagar, Lucknow Electrification Work with Panels 1,21,89,572.00 Running Ajay Singh 9918428877
4 2015 Roosewood Hotel Bahadrabad Shivalik Nagar Haridwar Electrification Work 1,80,00,000.00 Completed Dharmendra Dabral 9760567777
5 2018 BIC Cello India Pvt Ltd - VAPI Gujarat Turn -Key Project LT HT with Panels 70,000,000.00 Under Commissioning Stage Prasad Bhandari 9820756789
6 2018 BIC Cello India Pvt Ltd - SIDCUL Haridwar Turn -Key Project LT HT with Panels 2,00,00,000.00 Completed Prasad Bhandari 9820756789
7 2017 Natco Pharmaceuticals - Selaqui Dehradun Electrification Work with Panels 26,000,000.00 Under Commissioning Stage Sushanta Choudhary 7017846727
8 2016 YASH GREEN APPARTMENT DEHRADUN ( UTTARAKHAND) Turnkey work of HT & LT 18,000,000.00 Running Gupta Ji 9675587738
9 2016 WHISPERING WILLOWS APPARTMENT DEHRADUN ( UTTARAKHAND) Turnkey work of HT & LT 17,800,000.00 Running Mangla Yada 7351946866
10 2016 Malik Lifesciences Pvt.Ltd.Vardhman Industrial Estate, Roorkee (Uttarakhand) Electrification Work with Panels 26,000,000.00 Completed Mr. Vinay / Mr. Aman Trehan 7300777562
79 2016 Zircon technologies pvt. Ltd. Selaqui , Dehradun (Uttarakhand) Turnkey work of HT & LT 4,000,000.00 Completed Mr. Ankur Rana 7300777562
11 2015 ASIAN GALAXY PVT. LTD.Sidcul Haridwar ( U.K) Electrification Work with Panels 3,000,000.00 Completed Mr. Vikas Garg 9557008300
12 2016 Om Sai Pharma Pvt. Lmited, Sidcul Haridwar (U.K) Electrification Work with Panels 15,000,000.00 Running Sidharth Vasistha 9910038888
13 2016 Graphic Era Hill University , Dehradun (U.K) Electrification Work with Panels 4,000,000.00 Running Vinay Gupta 9897067425
14 2010 Mirc electronics ( Onida TV ),Delhi-Roorkee Highway NH-58,Village Mundiyaki,Pargana,Manglorur, Turn Key Project of Washing machine Plant 6,278,900.00 Completed Mr. Sumit khare
15 2016 HEMA ENGINEERING LTD.SIDCUAL , HARIDWAR (UK & HP) Turnkey work of HT & LT 11,000,000.00 Running Vijay Thapa 9927099085
16 2015 Amrit Bottlers Private Ltd.( Hotel Hilton Gardn Inn) Turnkey work of HT & LT 35,000,000.00 Running Mr. Anjani Kumar Singh 9454130900
17 2015 Anandam City ( AUM Infratech Pvt.Ltd.),Nh-58,Delhi-Haridwar Highway,Haridwar. Electrification Work with Panels 6,872,010.00 Completed U.K.Saini 9219022219
18 2015 Troika Pharmaceuticals Ltd.,C-1,Sara Ind.Estate Ltd.,Chota Rampur,Selaqui,Dehradun L.T Panel 912,300.00 Completed Ajay Mishra -9719361527
19 2015 Dolphin ( P.G.) Institute of Biomedical & Natural Sciences.,V.P.O.,Manduwala,Chakrata Road,Dehradun -248007,( U.K ) L.T Panel 1,148,900.00 Completed Vinod Kumar 9568004571
20 2015 Kunstocom ( India) Ltd., E-134-135,E.P.I.P.,Neemrana,Alwar,Rajasthan. L.T Panel 828,900.00 Completed Sandip Kumar -8744007445
21 2015 Sri Sri Ayurveda Trust,Plot No-B13 & B14,Sigaddi Growth Center,Kotdwar, ( U. K ) L.T Panel 1,129,000.00 Completed Subham Saxena 9917100279
22 2015 Axa Parenterals Ltd.,Axa House,Kishanpur,Jamalpur,Puhana Chowk,Roorkee,( U.K) L.T Panel 989,000.00 Completed S. K. JANA 9997577729
23 2015 Forace industries ( Unit-11), Plot No-40,sector-11,IIE,Sidcul,Haridwar ( U.K) L.T Panel 1,439,000.00 Completed Prasanta Chakrabarty 9756709191
24 2015 KMC Plastochem,Plot No.20,Sector-8B,IIE Sidcul,Haridwar, ( U.K.) L.T Panel 1,221,900.00 Completed Munish Sharma 9997228666
25 2015 Psychotropics India Ltd.,SIDCUL,Haridwar L.T Panel 1,680,000.00 Completed Mr. Bashir 7417000723
26 2014 Vinayak Grant , SIDCUL Electrification Work for Hotel 6,890,000.00 Completed VINAYAK 9412070633
27 2014 Automat Irrigation Pvt.Ltd. , SIDCUL,Haridwar Electrification Work with Panels 1,828,000.00 Completed Mr. Vijay Warke 9997017878
28 2014 Corum Lifesciences Pvt.Ltd.,SIDCUL,Haridwar L.T Panel 1,736,262.00 Completed Mr.Mohd.Azhar 9639054555
29 2015 Patanjali Ayurved Ltd.,Padartha,Dhanpura,Laksar,Haridwar L.T Panel 2,837,500.00 Completed Mr.D.C.Joshi 9760030889
30 2015 Nepal Gramodhyog Pvt.Ltd.,Bhatbhateni,Ward No-4,Kathmandu,Nepal L.T Panel 3,700,000.00 Completed Mr.Bimal Shah 9779801043787
31 2015 Penta Latex,SIDCUL,Haridwar Electrification Work with Panels 1,890,000.00 Completed Mr.DS Mishra 9012239000
32 2014 Maxcure Nutravedics,SIDCUL,Haridwar Electrification Work with Panels 1,280,000.00 Completed Mr.Abhimanyu Mishra 9358188688
33 2015 Wallace Pharmaceuticals Pvt.Ltd.,Nalagarch,Baddi,Himachal Pradesh Electrification Work with Panels 3,200,000.00 Completed Mr.Manoj Gautam
34 2015 Amcor Flexibles India Pvt.Ltd.,SIDCUL,Haridwar. Turnkey work of HT & LT 6,240,000.00 Completed Mr. Manoj Agarwal 9997766203
35 2015 KMC Electronics,Kotdwar Misc Work 1,600,000.00 Completed Mr.Ajay Goel 81928 99201
36 2015 Zapfen International,SIDCUL,Haridwar Turnkey work of HT & LT 8,890,000.00 Completed Mr.Sanjeev Kabra 8006401527
37 2013 M/s. Pure & Cure Healthcare Pvt.Ltd.,SIDCUL,Haridwar Turnkey work of HT & LT 28,900,000.00 Completed Mr Yatish Rathore 8392926001
38 2013 Hindustan Vidyut Products Ltd Electrification Work with Panels 3,100,000.00 Completed Mr. Deepak Kejriwal
39 2013 Hero Realty RC-II, Haridwar External Electrification Work 6,800,000.00 Completed Mr. Sandeep Sehgal
40 1998 to 2010 Bilag, GIDC, Vapi, Gujarat HT & LT Installation, Suppy, Erection, Testing & Commissioning of 32 Nos. of Chemical Plant Projects 182,900,000.00 Different PO's for different projects/jobs Running Mr. Bipin K Patel 9824751704
41 2013 Wipro imited, SIDCUL, Haridwar Misc Work 3,200,000.00 Misc Completed Mr Inder Bhargav 8941013835
42 2013 Anchor Panasonic, SIDCUL, Haridwar Misc Work 223,200.00 Misc Completed Mr Manoj Prasad 8755315877
43 2013 Akums Drugs & Pharmaceuticals, Haridwar Misc Work 106,234.00 Misc Completed Mr Yatish Rathore 8392926001
44 2013 Prince Industries, SIDCUL, Hridwar Turnkey work of HT & LT 1,420,419.00 Misc Completed Mr Kishore 9368199996
45 2013 United Engineers India, Haridwar VCB (HT Panel) + Cabling 775,270.00 2013-14/010 Completed Mr. A. K. Jain 9760098312
46 2013 TCPL Packaging Pvt. Ltd, AIIDC Industrial Growth Centre, Chygaon, Satabari , Kamrup Assam Turnkey Project 8,500,000.00 2013001476/1 Max. Completed Mr Tejbhan
47 2013 Hamilton Houseware Pvt. Ltd, AIIDC Industrial Growth Centre, Chygaon, Satabari , Plot no-19 Kamrup Assam Turnkey Project 9,000,000.00 2013001476/1 Max. Completed Mr Dinesh Bhatt 9760098312
48 2010 Gujarat NRE Coke Ltd. Sreel Division, Bhachau, Kutch, Guj. Turn Key Project of Steel Plant 6,567,000.00 Completed Mr. Manish (C.F.M.) Mr. S S Jha DGM-Elec 9879531025
49 2013 Windlas Biotech Limited, Dehradun LT Panels 2,315,400.00 F066, F111 Completed Mr Lok Nath 9997001451
50 2013 Hindustan Unilever Ltd. Chiplun, Maharashtra MCC Panels 3,374,460.00 D06132256 Completed Mr. Gautam Maiti 9373003336
51 2014 United Engineers India, Haridwar Misc Work 1,491,053.00 Misc Completed Mr. A. K. Jain 9760098312
52 2013 United Engineers India, Haridwar Main LT & Capicitor Panel 2,250,000.00 2013-14/009 Completed Mr. A. K. Jain 9760098312
53 2013 Lotus Infra Projects Pvt Ltd., Haridwar Raghunath Residency's Electricals Panels 6,968,099.00 Nil Completed Mr. S P Agarwal 8400777999
54 2013 Lotus Infra Projects Pvt Ltd., Haridwar Raghunath Mall's and Multiplex 5,331,900.00 Nil Completed Mr. S P Agarwal 8400777999
55 2013 Roop Automotives Ltd., IMT,Manesar, Gurgaon Supply & Cabling at there Plant 450,000.00 6120000422 Completed Mr. Praveen Gaur 9810595327
56 2013 Bharti Retail. Ltd., Gurgaon Supply & Cabling at there Ware House 180,000.00 7300010069 Completed Mr. Dinu M \Nair 9968384818
57 2013 Bharti Walmart Pvt.Ltd., Gurgaon Supply & Cabling at there Ware House 7,000,000.00 7100012718 Completed Mr. Dinu M \Nair 9968384818
58 2013 X L Laboratories Pvt. Ltd., Bhiwadi, Rajasthan Turn Key Project of Pharmaceutical Manufacturing Plant 5,782,000.00 XL/PG-16/06 Completed Mr. Pawan Gupta 9250919473
59 2013 Nipro Glass India Pvt.Ltd.,Meerut, U.P Turn Key Project of Pharmaceuticals Glass Manufacturing Plant 11,264,700.00 Nil Completed Mr. Rajesh Mall 8979997105
60 2013 Vee Tee Auto Manufacturing Co.Pvt.Ltd.,Gaziabad,U.P Turn Key Project of Auto Manufacturing Plant 3,362,360.00 2013-14/07/04 Completed Mr. Prassana Kumar 9760571234
61 2013 X L Laboratories Pvt. Ltd., Nimrana, Rajasthan Turn Key Project of Pharmaceutical Manufacturing Plant 5,445,000.00 XL/PG-12/09 Completed Mr. Pawan Gupta 9250919473
62 2013 Genuine Electric Company Pvt. Ltd., SIDCUL, Haridwar Turn Key Project of Electric Switch Manufacturing Plant (Under Execution) 23,050,000.00 005/12-3-13 Completed Mr. Girish Agarwal 9319434200
63 2012 Metro Hospital & Heart institute,Plot No-F-1,Sector-61,IIE,Sidcul,Haridwar. Electrification Work with Panels 5,298,000.00 Completed
64 2012 Deepak Nitrite Limited, Turn Key Project of Chemical Plant 67,200,000.00 20126450076 Under Commissioning Stage Mr. S.V.Gupta HOD-Electricals 9723432453
65 2012 Anchor Panasonic, SIDCUL, Haridwar Turn Key Project of Electric Switch Manufacturing Plant 7,881,351.00 AEPL/HRDWR/FM/SDL/12-13/59 Under Commissioning Stage Mr. B. D. Yadav 9368773381
66 2012 Great White Electricals Pvt. Ltd, Laksar Road, Haridwar Turn Key Project of Electric Switch Manufacturing Plant & 33KV Switch Yard 19,000,000.00 Hwr/2011/12-12/bnb Running Mr Bhargav Bhuch 9359559021, 8477001067
67 2002 to 2006 Arya Hospital, G.I.D.C,Vapi,Gujarat. Internal & External Electrification Work with L.T Panel 9,812,500.00 Different PO's for different projects/jobs Completed Mr. N.P Patel
68 2011 Gallant Metal, Samakhali, Kutch, Guj. Turn Key Project of Power Plant 4,550,000.00 Completed Mr. Anumol Anand 9673992245, 9901644331
69 2002 to 2010 Micro Inks Ltd., GIDC, Vapi, Morkhal-Silvassa & Daman HT & LT Installation, Suppy, Erection, Testing & Commissioning of 32 Nos. of Chemical Plant Projects 127,400,000.00 Different PO's for different projects/jobs Completed Mr. Suresh S Patel Mr. Nanu Bhai Patel 9824751704
70 2012 Ruchi Soya Industries, Durgauti, Bhabhua, Bihar Turn Key Project of Edible Oil & Dalda Manufacturing Plant 5,169,486.00 0035 & 0088 Running Mr. Jain 9771417218
71 2006 to 2001 21st Century Hospital, G.I.D.C,Vapi,Gujarat. Internal & External Electrification Work with L.T Panel 14,268,000.00 Different PO's for different projects/jobs Completed Mr. Nadkrni
72 2011 Gokul Refoils & Solvent Ltd., Gandhidham, Guj. Turn Key Project of Edible Oil Manufacturing Plant 4,191,400.00 GRSL/SEP/ELEC/Inst/0301 Dt. 1.3.11 Completed Mr. Ashwin Patel 9879112567
73 2011 Electrotherm, Samakhali, Kutch, Guj. Turn Key Project of Steel Plant 9,500,000.00 ETK/PROJ/09-10/1557 Completed Mr. Pradeep Mehnod 9879204161
74 2012 Birla Tyres, Laksar, Haridwar Turn Key Project of Tyre Manufacturing Plant 31,200,000.00 UNIT-II/1315000019 Dt. 16-8-12 Completed Mr. V M Chaturvedi 9639018374
75 2016 Sterlite Technologies Limited Vardhmann industrial Area , Haridwar (Uttarakhand) Electrification Work with Panels 5,000,000.00 STL/PCB/2016-17/665000 Running Mr. Hitesh Patel 9422757331
76 2013 Hamilton Houseware Pvt. Ltd, SIDCUL, Haridwar Aluminium Bus Duct + Misc Electrical Works 1,722,681.00 2013001476/1 Completed Mr Dinesh Bhatt 9368168564
77 2012 Akums Drugs & Pharmaceuticals, Haridwar Turn Key Project of Pharmaceutical Manufacturing Plant 1,532,040.00 4500030582/21.1.12 Completed Mr. Sanjay Dhawan 9368574248
78 2012 Mahindra & Mahindra Ltd., SIDCUL, Haridwar Turn Key Project of Jeep & Auto Manufacturing Plant 3,920,347.00 HRDW/BRP/3200051332 Dt. 29.10.12 Running Mr K Shalabh , Mr. Pyare Bandhan 8006400306, 9867878980
79 2013 Hero Realty RC-I, Haridwar Electrification Work for Residential Flats 35,000,000.00 HRL/DEL/HG/REV-LOI/453 Under Execution Mr. Vinod Rawat 9219631237
80 Sep-2011 to Dec-2012 Shakti Bhog Ltd., IP-2, SIDCUL, Haridwar Turn Key Project of Biscuit & Snaks Manufacturing Plant 1,650,000.00 SBFL/HWR/11-12/ADM30 Completed Mr. Prameshwaran 9690017594
81 Sep-13 Hero Realty RC-I, Haridwar Electrification Work for Residential Flats 35,000,000.00 Under Execution Mr. Sandeep Sehgal
82 July- 2015 to Aug-16 Fortune Hotel (ITC) Electrification Work with Panels 2,80,00,000.00 Completed Faiz Khan 8853000454
83 May-2019 to Dec-2019 Akums Drugs & Pharmaceuticals, Haridwar Electrification Work with Panels 3,937,000.00 Completed Bharat Singh Bisht 8859006343
84 Aug-2019 to Oct-2019 Abdos Labtech Pvt Ltd, Bhagwanpur Electrification Work with Panels 3,300,000.00 Completed Arjun Singh 7455039341
85 Apr-2019 to Dec - 2019 Malik Life Sciences Private Limited, Padartha Electrification Work with Panels 2,115,316.00 Completed Bharat Singh Bisht 8859006343
86 Apri-2019 to Sep-2019 Tube Investment of India Limited,Padartha Electrification Work with Panels 2,829,981.00 Completed Ramanujan 9720103392
87 Aug-2019 to Dec-2019 Saptam Decore Pvt Ltd,Muzafirnagar Electrification Work with Panels 766,466.00 Completed Shusheel Ji 9837005372
88 Sep-2019 to Oct-2019 Kishore Kumar,Patna Electrification Work with Panels 1,748,668.00 Completed Kishore 9431281205
89 May-2019 to June 2020 Pure and Cure Health Care Pvt Ltd, Sidcul Electrification Work with Panels 6,095,327.00 Completed Bharat Singh Bisht 8859006343
90 April -2019 onwards Tirupathi Structuals Ltd,Bhagwanpur Electrification Work with Panels 2,640,000.00 Completed Mohan Ji 9258061220
91 Nov-2018 to Feb-2019 Risiveda Herbal Products,Sidcul Electrification Work with Panels 3,516,775.00 Completed Mahesh Mishra 7300501737
92 Aug-15 Hotel Hilton Garden (Amrit Bottlers) Gomti Nagar Lucknow Electrification Work with Panels 3,60,00,000.00 Under Commissioning Stage Hirdesh Tyagi 7510003669
93 Feb-2020 onwards Applied Communication and Controls (HFA) , Selaqui Electrification Work with Panels 6,000,000.00 Running Deepak Sharma 9760339510
94 May-2019 onwards Penta Latex,SIDCUL,Haridwar Electrification Work with Panels 13,423,158.00 Running Veera Pandian 9003979121
95 May-2019 onwards Kwality Pharmacuticals,Amritsar Electrification Work with Panels 1,103,834.00 Running Aman 8233483305
96 May-2019 onwards Kwality Pharmacuticals,Himachal Pradesh Electrification Work with Panels 3,273,253.00 Running Aman 8233483305
97 Oct - 2019 onwards Indian Hotel and Resorts,Jammu Electrification Work with Panels 3,500,000.00 Running Hridesh Thyagi 995866586
98 May-2019 onwards Troika Pharmaceuticals Ltd.,C-1,Sara Ind.Estate Ltd.,Chota Rampur,Selaqui,Dehradun Electrification Work with Panels 3,239,722.00 Running Sukhraj Singh 7252019111
99 July-2020 onwards Raffrix Essentials,Bhagwanpur Electrification Work with Panels 3,135,220.00 Running Sanjeev 9899980508
100 Aug-2020 onwards Jayashree Polymers Pvt Ltd, Bahdrabad Electrification Work with Panels 6,000,000.00 Running Ajay Ji 9368244116
101 Jan-2021 Onwards RS Enterprises,Sonipat Electrification Work with Panels 10,000,000.00 Running Sanjay Ji 9810790148